* Bids are due June 15, 2020 at 1:00PM
This project consists of the following:
The Project includes (2) two new CTE buildings; one for media arts and the other for showcasing students work.
The scope of work includes, but not limited to:
A. A new 10,000 sf Media Arts building with classrooms and restrooms.
B. A new 14,000 sf assembly/showcase building with roof top offices and outdoor classrooms.
C. New site work including hardscape and landscape, new ramps and stairs.
D. New elevator and (2) two stairwells.
E. New plumbing, electrical, and mechanical.
F. New fire sprinkler system.
G. New fire alarm system.
H. New parking with accessible spaces.
Engineer’s Estimate: $15,000,000
Plans can be obtained on Smartbid or the following link:
https://schipperconstruction.box.com/s/d1fmdvnah94w7enf28jau538fii7m807
If you have trouble accessing the files or would like a CD or electronic set, please contact us at info@schipperconstruction.com. We will have a hard copy set of plans in our plan room
This project is PREVAILING WAGE and a DIR # is required to bid this project
MBW / WBE / DVBE Contractors are encouraged to bid
MEP Contractors will need to be prequalified in order for us to accept the bid
FSCC Estimator: Erwin Villegas erwin@schipperconstruction.com
SCOPE OF WORK:
The scope of work includes hard demolition, site demolition, haz mat abatement, surveying, earthwork, SWPPP, AC paving, pavement markings, site concrete, underground utilities, landscape & irrigation, building concrete, structural steel, ornamental iron, rough carpentry, finish carpentry, cabinetry, waterproofing, insulation, roofing, flashing & sheetmetal, roof accessories, caulking & joint sealants, fire caulking / fireproofing, doors frames hardware, storefront, windows, plastering, metal stud framing, drywall, tile, acoustical ceilings, flooring, painting, markerboards, toilet partitions & accessories, signage, fire extinguishers, audio visual, window treatment, elevators, fire sprinklers, plumbing, HVAC, electrical, fire alarm.