* Bids are due March 20, 2020 at 3:00PM
This project consists of the following:
This project is to remove an existing soft-story condition to an existing apartment complex building and to anchor the building to the foundation. No attempt is made to bring the entire building into compliance with the current Building Code.
Plans can be obtained on Smartbid or the following link:https://schipperconstruction.box.com/s/kro7385n6kjy055s2v1m2zxjqm67ks69
If you have trouble accessing the files or would like a CD or electronic set, please contact us at info@schipperconstruction.com. We will have a hard copy set of plans in our plan room
This project is NOT PREVAILING WAGE
MBW / WBE / DVBE Contractors are encouraged to bid
FSCC Estimator: Erwin Villegas erwin@schipperconstruction.com
SCOPE OF WORK:
The scope of work includes hard and soft demolition, hard demolition, shoring, cast in place concrete, concrete foundations, shotcrete, masonry, rough carpentry, plaster patching, flooring, painting and misc. electrical.