Back to All Events

UCLA Medical - Quinto St.


 

* Bids are due April 7, 2020 at 3:00PM

This prevailing wage project consists of the following:  

This project is an new tenant improvement of existing medical office for UCLA oncology medical office, consisting of but not limited to the construction of new interior non-bearing partition walls, new doors, new built-in cabinetry, new mechanical, electrical, and plumbing,  This facility is an ambulatory medical office that is not licensed by the state.  Therefore this is not an OSHPD3 facility.  Project to comply with noise ordinance max 53db@PL.   

Plans can be obtained on Smartbid or the following link:
https://schipperconstruction.box.com/s/0c605hjhboxc73q3dhnhavirlke01dqv

If you have trouble accessing the files or would like a CD or electronic set, please contact us at info@schipperconstruction.com. We will have a hard copy set of plans in our plan room

This project IS PREVAILING WAGE
MBW / WBE / DVBE Contractors are encouraged to bid

FSCC Estimator: Erwin Villegas erwin@schipperconstruction.com


SCOPE OF WORK:
The scope of work includes hard and soft demolition, concrete slab patching, ornamental iron, counter supports, cabinetry & countertops (plastic laminate, quartz, corian), insulation, roofing patch, doors frames hardware, glass door, monitor shields, metal stud framing, drywall, ceramic tile, acoustical ceilings, flooring, painting, toilet accessories, fire extinguishers, signage, window treatment, nurse call, security, plumbing, HVAC & electrical

Earlier Event: March 12
1015 Laguna St. Seismic