SB Middle School Kitchen Renovations
1321 Alameda Padre Serra, SB, CA. 93103
Bids Due: 2/11/2020 @ 03:00 PM
You can download a set of plans by going onto our SmartBid website or using this link:
https://schipperconstruction.box.com/s/thmg6rj658tw1ac2fgqj27lkdpwcyxxs
SCOPE OF WORK. Kitchen and support renovations of 922 SF deli & art classroom to provide a school kitchen with a new Class One hood and grease interceptor, new steel stair & platform in existing boiler room for new refrigeration & dry storage. Including: soft & hard demo, concrete, light gage metal framing, structural steel, insulation, drywall, interior doors/frames & hardware, epoxy flooring, interior finishes, Food Service equipment, painting, plumbing, HVAC and controls, & electrical.
Non mandatory job walk is scheduled for January 28, 2020 at 2:00 pm
PreBid RFIs will be received until January 30, 3:00 P.M.
This project is NOT prevailing wage.
MBW / WBE / DVBE Contractors are encouraged to bid
FSCC Estimator: Scott Jacobs. sjacobs@schipperconstruction.com. (805) 963-4359 x 116