Back to All Events

Laguna Blanca School - (4) Projects


Bids are due February 10, 2020 at 3:00PM

** THERE ARE (2) ADDENDUM ON THIS PROJECT TO DATE

This project consists of the following:  

This consists of (4) separate projects in which we will need separate estimates for.  The four projects are:

Building Conversion to Science Classroom – Renovation of (E) 3073sf locker room building into a new Science Classroom

Jackson & Stewart Buildings Interior Alteration – Tenant Improvement of (E) Classroom Building and Teacher’s Lounge

Site Improvements – New landscape and hardscape on upper and lower campus including retaining walls, concrete paving, asphalt paving, stacked boulders, & underground utilities

New Storage Shed – New Masonry storage sheds at the Lower Campus next to the Basketball Courts

Plans can be obtained on Smartbid or the following link:
https://schipperconstruction.box.com/s/yxh833lxqetjggwmfb31ai57li3o9k94

If you have trouble accessing the files or would like a CD or electronic set, please contact us at info@schipperconstruction.com. We will have a hard copy set of plans in our plan room

This project is NOT PREVAILING WAGE
MBW / WBE / DVBE Contractors are encouraged to bid

FSCC Estimator: Erwin Villegas erwin@schipperconstruction.com

SCOPE OF WORK:
The scope of work includes hard and soft demolition, site demolition, grading and earthwork, underground utilities, surveying, asphalt paving, site concrete, site furnishing, landscaping, shoring, underpinning, concrete, masonry, stacked stone, structural steel, ornamental iron, rough carpentry, finish carpentry, cabinetry, epoxy resin countertops, waterproofing, insulation, roofing, sheet metal, skylights, joint sealants, access doors, doors frames hardware, windows, plaster, drywall, tile, acoustical ceilings, flooring, painting, toilet accessories, signage, fire extinguishers, kitchen equipment, fume hoods, plumbing, HVAC, & electrical.