Back to All Events

SB Zoo Giraffe Barn


 

This is a new 1300 square foot Giraffe Barn located at the existing exhibit inside the Santa Barbara Zoo.  The barn consists of caissons and grade beams for the foundation, a concrete slab and structural steel with wood framing for the structure.  The roof will be a Sarnafil TPO Single Ply Membrane Roof and tie interior / exterior walls will have galvanized metal panels and the exterior walls will be plastered.  There are details for a structural steel animal management system included in this set of plans.

If you have trouble accessing the files or would like a CD or electronic set, please contact us at info@schipperconstruction.com. We will have a hard copy set of plans in our plan room
https://schipperconstruction.box.com/s/4vgmacuyo2ttlaka33epa7dxuzkxcy9o


This project is NOT PREVAILING WAGE
MBW / WBE / DVBE Contractors are encouraged to bid
FSCC Estimator: Erwin Villegas (erwin@schipperconstruction.com)


The scope of work includes earthwork and site clearing, hard and soft demolition, caissons, foundation concrete, slab on grade concrete, stonework, structural steel, unistrut animal management system, wood framing / rough carpentry, Icynene insulation (walls & ceilings), single ply TPO roof membrane, sheet metal, doors frames hardware, windows glass & glazing, plastering, painting, HVAC, Plumbing, Electrical