This project consists of a new 1300sf Restaurant Tenant Improvement to Suite 9 located in the lower level of Coast Village Plaza.
If you have trouble accessing the files or would like a CD or electronic set, please contact us at info@schipperconstruction.com. We will have a hard copy set of plans in our plan room
Plans can be found using this link: https://schipperconstruction.box.com/s/7lcsicy29wi8mf3sg3qk0gnktlnrn6wg
This project is NOT PREVAILING WAGE
MBW / WBE / DVBE Contractors are encouraged to bid
FSCC Estimator: Erwin Villegas (erwin@schipperconstruction.com)
The scope of work includes soft demolition, hard demolition, concrete patching, ornamental iron, misc. metals, rough carpentry, finish carpentry, cabinetry, solid surface countertops, insulation, FRP installation, roofing, glass & glazing, metal stud framing, drywall, acoustical ceilings, polished concrete flooring, LVT Flooring (alternate), painting, signage, fire extinguishers, lockers, fire sprinklers, plumbing, HVAC and Electrical.