SBHS ADA Restroom Alterations (Prevailing Wage)


 

* Bids are due May 4, 2020 at 1:00PM

This project consists of the following:  

To remodel (E) Student Restrooms to comply with ADA requirements.  Provide accessible door openings & hardware.  Provide (N) finishes at walls and ceilings as indicated.  Provide (N) LED Lighting and relocate (E) Fire Alarm devices as required.  Provide accessible high-low drinking fountains with bottle filling station at exterior of each building.

Engineer’s Estimate:            $900,000

Plans can be obtained on Smartbid or the following link:
https://schipperconstruction.box.com/s/o25gotkwaufc7udf67dyok060yv7sk34

If you have trouble accessing the files or would like a CD or electronic set, please contact us at info@schipperconstruction.com. We will have a hard copy set of plans in our plan room

This project is PREVAILING WAGE and a DIR # is required to bid this project
MBW / WBE / DVBE Contractors are encouraged to bid

FSCC Estimator: Erwin Villegas erwin@schipperconstruction.com

SCOPE OF WORK:
The scope of work includes hard demolition, soft demolition, haz mat abatement, concrete patching, ornamental iron, rough carpentry, finish carpentry, doors frames hardware, drywall, acoustical ceilings, ceramic tile, painting, toilet accessories, signage, plumbing, HVAC, electrical.