Back to All Events

Santa Barbara Plaza Improvements - Natural Grocer at 29 S. Milpas


 

BIDS 8/15/19 at 3:00PM

Exterior improvements to the Shopping Center located at 29 S. Milpas known as Santa Barbara Plaza. The scope includes a new 606 square foot CMU loading room addition, new recessed loading dock, enclosed outdoor CMU storage area and trash enclosure, complete Facade remodel including framing a new Plaster Entry Tower with Ornamental Metal Screens, Reconstruction of Asphalt Parking Lot, Storm Drainage and Pavers, new Site Lighting and new Landscaping and Irrigation.

You can Download plans and Soils Report by going to our SmartBid Website or at the Subcontractor Center on our Website or at the link below.

https://schipperconstruction.box.com/s/68d1o6xzl9zifvn6asbrkasxz66k3fvr

Estimator: Phil Orr - phil@schipperconstruction.com

Earlier Event: July 17
1125 & 1127 State St. 2nd Floor TI