The project involves the Refresh of the approximate 7,900 square foot Fleishmann Auditorium at the Santa Barbara Museum of Natural History. The scope of work includes selective demolition, landscaping, misc. carpentry, Misc. Metal and railing, new clay tile and PVC roofing, sheet metal, doors and hardware, mirrors, new window film, drywall, acoustical treatments, patch and refinish wood flooring, carpeting, painting, new stage curtain, roller shades, new Wheel Chair Lift, removal and replacement of existing HVAC, electrical, and lighting.
Link to the plans below.
https://schipperconstruction.box.com/s/6fcf2vnpq3vfnif1euuzl26aovsnm0ni
Back to All Events
Earlier Event: January 8
Tapjoy/Cameron Pacific Tenant Improvements
Later Event: January 21
Carpinteria City Hall Renovations T.I. 5775 Carpinteria Ave