Back to All Events

Carpinteria City Hall Renovations T.I. 5775 Carpinteria Ave


 

You can download a set of plans by going onto our SmartBid website or using this link:

                                      
https://schipperconstruction.box.com/s/slj8s78hrz7dnlzsmkmjax6bm1ybwpnb

 

 SCOPE OF WORK.  Interior/exterior renovations of an existing 11,000 sf single story building in downtown Carpinteria consisting of: site & architectural concrete, unit pavers, underground utilities, landscaping, site furnishings, soft & hard demo, interior finishes, light gage metal framing, wood framing, structural steel,  aluminum handrails, insulation, roof patch, drywall, interior doors, frames & hardware, acoustic ceilings & suspended wood ceilings, doors & hardware, millwork/cabinets & countertops, glass & glazing, carpet & vinyl flooring, painting, ceramic tile, ADA signage, toilet partitions & accessories, metal roofing and insulation, fire protection & alarm, plumbing, HVAC & controls, & electrical.

ARCHITECTS PROJECT DESCRIPTION: Description: Interior TI. Accessibility upgrades, remediation of sewer backup damage. Removal of vinyl asbestos tile by owner.

 This project is prevailing wage. DIR # is required w/ bid.

 MBW / WBE / DVBE Contractors are encouraged to bid

Last day to submit RFIs is January 25, 2019.

 

FSCC Estimator: Scott Jacobs. sjacobs@schipperconstruction.com. (805) 963-4359 x 116

Earlier Event: January 21
Fleishmann Auditorium Refresh
Later Event: January 29
421 Pine Ave T.I.