Back to All Events

Santa Barbara High School Boiler Replacement and HVAC Revisions


 

Project name:  Santa Barbara High School Boiler Replacement and HVAC Revisions

Preconstruction Manager: Erwin Villegas

Email: erwin@schipperconstruction.com

Additional Information:

Submit RFI's by Email to Erwin Villegas - DO NOT CALL THE ARCHITECT

Check website regularly for addendums issued during the bid period.

 Estimated Project Budget: $6,000,000

Projected Start Date: August 2018

Bid date and time: 7/11/18 at 3:00PM

This project consists of the following:  Replace Existing steam boiler system at Main building and 20’s/30’s Wings, Gymnasium Building and Field House with Hot Water Boiler System, including associated plumbing and electrical work as follows:

1) Main Building and 20’s / 30’s Wings:

Replace (E) Steam Boiler in Basement Boiler Room with Hot Water Boiler

Restore (E) Radiators in Classrooms and Offices

Replace (E) Fan Unit w/ Individual Fan Coil Units in Framed Soffits in 20’s Wing

Replace (E) Radiators w/ individual Fan Coil Units in Framed Soffits in 30’s Wing

Replace (E) Radiators w/ Heat Pumps in Framed Closets at Computer Rooms 34 and 35

Replace (E) Rooftop Mechanical Units at Auditorium, Old Gym and Classrooms

2) Gymnasium Building

Restore (E) Radiators in Support Spaces

Provide New Rooftop Mechanical Units and Associated Ductwork at Gymnasium

Provide New Mechanical Units at Basement Level

3) Field House

Remove (E) Steam Boiler in Basement Boiler Room and Associated Piping

Remove (E) Radiators in Classrooms and Offices

Remove (E) Suspended Heaters in Locker Rooms

Replace (E) Suspended Acoustical Panel Ceilings & Lighting in Classrooms and Office

Install New Rooftop Mechanical Units for Locker Rooms, Classroom and Offices


Plans, Specifications & Addendum can be found using the following link:https://schipperconstruction.box.com/s/pdwdoh2kc8dzwkq1gt80ktf4aiwdkcjx

If you have trouble accessing the files or would like a CD or electronic set, please contact us at info@schipperconstruction.com. We will have a hard copy set of plans in our plan room

A mandatory jobwalk will be scheduled in the next week; we will notify you on when this jobwalk will occur

Please break out your bid based on the following:

Main Building, 20’s / 30’s Wing                                         $ _________________

Gymnasium Building                                                          $ _________________           

Field House                                                                         $ _________________                                             

SB 693 is now in effect and all contractors working on this project must work to comply with these requirements.  Contractor agrees that skilled journeypersons employed to perform work on the Project by Contractor or its subcontractors at every tier are graduates of an apprenticeship program for the applicable occupation at the following percentages per Section 2601:  At least 40 percent for work performed on or after January 1, 2018

This is a DSA Project

This project is PREVAILING WAGE
MBW / WBE / DVBE Contractors are encouraged to bid
FSCC Estimator: Erwin Villegas (erwin@schipperconstruction.com)
 

SCOPE OF WORK:

The scope of work includes hard and soft demolition, hazardous material abatement, concrete, structural steel / misc. metals, rough carpentry, finish carpentry, insulation, roofing, doors & frames, plaster, drywall, acoustical ceilings, flooring, painting, louvers / vents, access panels, Fire Sprinklers, Plumbing, HVAC, Electrical

All Mechanical, Electrical, and Plumbing trades must be prequalified with Santa Barbara School District to provide a bid on this project.

Pursuant to the provision of Section 1773 and 1773.2 of the Labor Code of the State of California, the District has obtained from the Director of Industrial Relations, the general prevailing rate of per diem wages and the general prevailing rate for holiday and overtime work is the locality in which the work is to be performed for each craft, classification or type of workman needed to execute the contract. It shall be mandatory upon the contractor to whom the contract is awarded, to pay not less that the said specified rates to all workmen employed by them in the execution of the contract, and to comply with the prevailing wage requirement set forth in the Labor Code. SKILLED AND TRAINED WORKFORCE: Subcontractor shall comply with Education Code Section 17405.7, which requires Subcontractor and its subcontractors at every tier to employ a skilled and trained workforce to perform all work on this Project that falls within an apprentice-able occupation in the building construction trades. Subcontractor shall submit Skilled and Trained Workforce Compliance Report with Progress Billings each month. Billings will not be accepted without the Reports. Skilled and Trained Workforce Requirements are for Prime Subcontractors only (1/2 of 1% of Total Contract.)

Pursuant to the provisions in Section 1711.1 of the Labor Code of the State of California, a contractor shall not be qualified to bid or engage in the performance of any contract for this project unless; (1) currently registered and qualified to perform public work pursuant to Section 1725.5; or (2) expressly is authorized to submit a bid by Section 1771.1 and provided the contractor is registered to perform public work pursuant to section 1725.5 at the time the contract is awarded.

This project is subject to the compliance monitoring and enforcement by the Department of Industrial Relations.

Earlier Event: May 31
UCSB Trace Metals Clean Rooms
Later Event: July 20
CLUB PILATES, 5 Points Center