Back to All Events

Interim Housing Multiple Campuses (Carpinteria USD)

  • 1480 Linden Avenue Carpinteria, CA 93013 (map)

Tuesday, May 02, 2017 at 02:00 PM — 02:00 PM

Project Estimator: Erwin Villegas
Proposals and RFI's may be emailed directly to erwin@schipperconstruction.com

Job walk; None, contact estimator if site visit is desired

Project Description: This project is to remove and relocate portable buildings including site preparation, site grading, demolition, site utilities, asphalt paving, new ADA restroom modifications, Plumbing, Electrical and Fire Alarm.

Plans, Specifications, and Addenda can be accessed as follows:

1. Access and download from the Frank Schipper Construction Co. website: https://schipperconstruction.box.com/s/jvqqeun32206oontucj02fze2sujguju

2. View plans at Frank Schipper Construction Co. : Plans and Specifications are available for review at the Frank Schipper Construction Co. office; 610 E. Cota St,, Santa Barbara, Ca. 8 AM to 5 PM, Monday – Friday. 


3. CD:. A copy of the plans and specifications can be burned on a CD and be mailed or picked up at our office. Please call the front desk at 963-4359 or email info@schipperconstruction.com to request a CD.

This project IS PREVAILING WAGE

DIR Certification is required

MBW / WBE / DVBE Contractors are encouraged to bid

The scope of work includes site prepration, site grading, hard and soft demolition, site utilities, asphalt paving & striping, truncated domes, chain link fence & gates, hazardous materials removal, modular stairs, ramps, & landings, steel pipe & tube railings, finish carpentry, lath & plaster, metal stud framing & drywall, ceramic tile, painting, toilet partitions & accessories, plumbing, electrical, fire alarm and Modular Building Relocation.

The campuses are at Canalino Elementary School, Carpinteria Middle School and Carpinteria High School. There are (3) different sets of plans and (3) different sets of specs & addendum.