Bid Invitation
Bids are due February 23, 2024 at 3:00 PM
This project consists of the following:
Exterior alterations to existing Hotel Roof Top to include:
New Bar at existing Roof Deck
New Trellis
New Wall Addition over Existing Pony Wall
Removal of Existing Planter at Roof Deck
Relocation of Existing Roof Drains and New Roof Drains per plans
New Retractable Awnings
New Equipment Covers
Plans can be obtained on Smartbid or the following link:
https://schipperconstruction.box.com/s/vtir0q3bze7x4jxk8ebr54b4982zkg9s
If you have trouble accessing the files, please contact us at info@schipperconstruction.com.
MBW / WBE / DVBE Contractors are encouraged to bid
This project is NOT Prevailing Wage
FSCC Estimator: Erwin Villegas erwin@schipperconstruction.com
SCOPE OF WORK:
The scope of work includes hard demolition, soft demolition, structural steel, ornamental iron, rough carpentry, finish carpentry, cabinetry, countertops, plaster, tile, painting / staining, awnings, food service equipment, fire sprinklers, plumbing, electrical.