* Bids are due April 26th at 3:00PM
This project consists of the following:
This project is a Tenant Improvement to an existing 1137sf commercial space to include the following:
Exterior:
Alterations to Existing Storefront to provide double door at entry
Interior:
New single occupancy accessible restroom
Non load-bearing partition walls
New kitchen equipment
New plumbing & electrical
New built-in cabinetry
New POS Counter
New dropped ceiling / acoustical ceiling
Please refer to the Interior Design Drawings to determine what will be furnished by Starbucks
Plans can be obtained on Smartbid or the following link:
https://schipperconstruction.box.com/s/pweowbp79bjsi28qjdqyizvb2j60nmdx
If you have trouble accessing the files, please contact us at info@schipperconstruction.com. We will have a hard copy set of plans in our plan room
This project is NOT PREVAILING WAGE
MBW / WBE / DVBE Contractors are encouraged to bid
FSCC Estimator: Erwin Villegas erwin@schipperconstruction.com
SCOPE OF WORK:
The scope of work includes hard demolition, site demolition, rough carpentry, finish carpentry, cabinetry, millwork, countertops, insulation, caulking & joint sealants, doors frames hardware, storefront, metal stud framing, drywall, FRP, flooring, tile, acoustical ceilings, wood slat ceilings, toilet accessories, signage, fire extinguishers, kitchen equipment, fire sprinklers, plumbing, HVAC, electrical, fire alarm