* Bids are due March 15, 2023 at 3:00PM
This project consists of the following:
This is a full campus renovation that consists of the demolition and reconstruction of the Center for Jewish Learning (CJL) Building including adding a new elevator for this building, an addition and renovation of the Sanctuary Building, additions to the Rooftop Photo Voltaic System, a new Playground & Courtyard and a new Parking Lot with new sitework, hardscape and landscape / irrigation. Please refer to the Bid instructions for more information. The Preschool will be fully operational during construction activity. Safety of our crews and the staff/children will be very important! They are requesting the bids to be broken out via the following:
Central Plaza Canopy $_____________
CJL Building $_____________
Playground Shade Canopy $_____________
Sanctuary Building $_____________
Site Improvements $_____________
Plumbing sheets for the 4 outdoor sinks at the playground are pending (anticipated this week). Sinks are already shown in the landscape and architectural plans. Sinks require connection to the site sewer and venting which will be documented in the forthcoming plumbing sheets.
The missing sheets will be provided next week for the Playground Shade Canopy Structure & Site Improvements.
There are design-build deferred submittal elements of the project which are noted on our cover sheets and should be included. They are as follows:
Photovoltaic System
Re-Roofing of Existing Sanctuary roof areas otherwise not included in bid set drawings (to match the new roof membrane and finishes indicated in our drawings)
Fire Alarm System for both buildings
Fire Sprinkler System for both buildings
Custom Play Structure
Plans can be obtained on Smartbid or the following link:
https://schipperconstruction.box.com/s/e2vhdeuo8odzg2vl7vxb4schyzs4lpqv
If you have trouble accessing the files, please contact us at info@schipperconstruction.com.
MBW / WBE / DVBE Contractors are encouraged to bid
This project is NOT Prevailing Wage
FSCC Estimator: Erwin Villegas erwin@schipperconstruction.com
There are Currently (6) Addendum on this project
Addendum 1 - Revised Plans
Addendum 2 - RFI 1-15 Responses
Addendum 3 - RFI 16-18 Responses
Addendum 4 - Revised Civil / Grading
Addendum 5 - RFI 19-31 Responses
Addendum 6 - RFI 32-38 Responses, Door Hardware Specifications