Vista Del Monte Kitchen Remodel
3775 Modoc Road
Santa Barbara, Ca
* Bids are due July 8, 2022 at 3:00PM
This project consists of the following:
Proposed renovation of existing 1900sf kitchen area including new kitchen equipment upgrades, minor demolition, new service pass through window, upgraded lighting, upgraded plumbing, epoxy flooring & FRP Walls.
Plans can be obtained on Smartbid or the following link:
https://schipperconstruction.box.com/s/bp2jurtknyfzq9z25nfsn09tfln7e0yl
If you have trouble accessing the files, please contact us at info@schipperconstruction.com. We will have a hard copy set of plans in our plan room
This project IS NOT PREVAILING WAGE.
MBW / WBE / DVBE Contractors are encouraged to bid
FSCC Estimator: Erwin Villegas erwin@schipperconstruction.com
SCOPE OF WORK:
The scope of work includes hard and soft demolition, misc. structural steel, wood framed walls / rough carpentry, finish carpentry, FRP on walls, insulation, doors frames hardware, drywall, epoxy flooring, painting, signage, fire extinguishers, food service equipment, fire sprinklers, plumbing, HVAC & Electrical.