This project consists of a 4181sf Tenant Improvement for the existing tenant space including new interior doors, non bearing interior walls, new ceiling system, new carpet tile flooring with rubber base, new electrical & reworking of Mechanical System.
Plans can be found here: https://schipperconstruction.box.com/s/rhg3ofymii4fnzecbzch1ezioh7sr9t8
If you have trouble accessing the files or would like a CD or electronic set, please contact us at info@schipperconstruction.com. We will have a hard copy set of plans in our plan room
This project is NOT PREVAILING WAGE
MBW / WBE / DVBE Contractors are encouraged to bid
FSCC Estimator: Erwin Villegas (erwin@schipperconstruction.com)
The scope of work includes soft demolition, hard demolition, site grading, asphalt, site concrete, truncated domes, parking lot striping & signage, insulation, metal stud framing & drywall, painting, carpet tile flooring, acoustical ceilings, painting, cabinetry, doors frames hardware, vision-lites / side-lites, ceramic tile, toilet partitions & accessories, fire sprinkler relocation, HVAC, plumbing & electrical.